Turnkey renovation & new-build finishing.
An apartment to renovate or a villa with the structural work just completed: we take charge of the site, coordinate every trade and hand you the keys to a finished home.

1
single point of contact
1
shared schedule
1
overall quote
01 — Your situation

Your apartment or villa is already built, but everything needs redoing: floors, walls, kitchen, bathrooms, storage. We manage the site from A to Z.
- For
- Apartments, villas, riads, commercial premises
- Indicative duration
- 4 to 12 weeks depending on the floor area
What is included
- Demolition, waste removal and protection of everything being kept
- Pipework and wiring overhauled with our partner plumbers and electricians
- Plastering, suspended ceilings and painting
- Tiling, stone and complete bathrooms
- Kitchen, cupboards, doors and wood cladding
- Final clean and handover
02 — One point of contact
Every trade, one schedule.
No more coordinating five different tradesmen. We plan the order of work, the supplies and the site supervision, and keep you updated every week.
- 01DemolitionStrip-out, waste removal, protection
- 02PlumbingPipework, sanitaryware, drainage
- 03ElectricsDistribution board, sockets, lighting
- 04Plaster & ceilingsSuspended ceilings, cornices, plastering
- 05PaintingSkim coats, tadelakt, paintwork
- 06Tiles & stoneFloors, walls, bathrooms
- 07JoineryDoors, cupboards, cladding
- 08KitchenDesign, manufacturing, fitting
03 — How it works
From the first visit to the handover of the keys.
01
Free visit
We come to the site, take the measurements and list what you need.
02
Detailed quote
Every item priced, a provisional schedule, materials chosen at the showroom.
03
Site supervision
A dedicated site manager, a progress update every week, photos on WhatsApp.
04
Handover
Final site inspection, snagging, handover of the keys.

04 — Developers & architects
Finishing at scale, with no compromise on standards.
- Pricing by work package and by unit typeStudios, apartments, villas: one clear price per home.
- A schedule aligned with yoursWork carried out in phases, alongside the other packages.
- Materials reservedThe same tile batch and the same wood from the first home to the last.
05 — Frequently asked questions